www.universalcurrentaffairs.com

Arab Gulf’s first coal-based power plant being developed in Dubai.

Arab Gulf’s first coal-based power plant being developed in Dubai.

The first coal-based power plant of Arab Gulf country is being developed in Saih Shuaib, Dubai, United Arab Emirates. The 2,400MW Hassyan clean coal power station will be built at an estimated cost of $ 3.4 billion.

The project will comprise four units of 600MW each, which are expected to start operations in 2020, 2021, 2022 and 2023 respectively. The power plant is expected to produce sufficient electricity to power approximately 250,000 households.

Hassyan Energy Company, which is a joint-venture (JV) between Dubai Electricity and Water Authority (DEWA, 51%) and the consortium of ACWA Power, Harbin Electric, and the Silk Road Fund (49%), is the project developer.

The project supports the Dubai Clean Energy Strategy 2050, which is aimed at producing environment-friendly energy. The programme aims to produce 25% of energy from solar power, 7% from nuclear power, 7% from clean coal, and the remaining 61% from gas by 2030.

Read Full News


Share:

No comments:

Post a Comment

Followers

Android App "CA DAILY UPDATES"

Translate

Popular Posts

Blog Archive

Recent Posts